The bathroom is the renovation everyone puts off. Small room, a lot of trades, and plenty that can go wrong behind the tile. That is exactly why it should be done by one crew that sees it through from demo to the final walkthrough.
A bathroom often runs two to four weeks. Material lead times and any surprises behind the walls can shift that, and you get a realistic schedule with your quote.
Most plumbing and electrical changes need a City of Winnipeg permit. We handle the applications and inspections. We stand behind our workmanship, all manufacturer warranties on fixtures pass directly to you, and the coverage is written into your contract before work starts.
Bathrooms across Winnipeg and Headingley, including River Heights, Crescentwood, St. Boniface, St. Vital, Transcona and Windsor Park. See all of them on Areas We Serve.
The consultation and quote are free. Call 431-WE-BUILD or request a free quote.
21 Blumberg Trail
Headingley, Manitoba, Canada, R4H 0B1
x 431-WE-BUILD (431-932-8453)
A construction [at] ghcgroup [dot] ca
Copyright © 2026 Great Horn Construction. All Rights Reserved.